Company
The location includes the precinct having a surface of 31ha and two fuel storage's each of 100 ha summing 231 ha. The local conditions of the site imposed the utilization of a narrow precinct. The front of the main building is parallel to the Mures river providing a short and direct cooling water circuit. The same location for 110, 220 and 400 kV outdoor substations which are placed inline with the main building.
The centralized control is performed through several specialized control rooms: one technical control room for each unit of two blocks; one central control room; one electrical control room for 110, 220 and 400 kV substation; one control room for fuel handling plant; one control room for water chemical treatment installations; one hydrotechnical control room. |